|
Reclamation Planning of Tailings Impoundment
|
|
ReclamationPlans
|
Improvement Plan Format of the Regulation Pertinent to Storage of Wastes
Take advantage of our consultancy services for reclamation planning of tailings impoundment
Out of Scope Reports of EIA
Out of Scope Reports of EIA, According to the EIA Regulations that came into force by published in 17 July 2008 dated Official Journal No. 26939:
Out of Scope Projects
PROVISIONAL ARTICLE 3- (1)Finals designs that approved before Regulation onEnvironmental Impact Assessmentthat was published inthe Official Journal No.21489dated07.02.1993or was allowed for permission, licenseor approval or/and expropriationdecision through competent authoritiesin accordance withenvironmental legislationand other relevant legislationorwas approvedfor investment programorlocal developmentplansorbefore this date ofprojects that commence production and/ orbegan operatingwhich can be proved by documentation are will not be subjected to these requirements on condition that required permissions (Environmental Law and other related regulations), remain reserved.
Ekonorm Engineering can achieve all necessary documents, procedures and related operations for your out of EIA scope reports in order for you to receive approval.
According to statement of the Ministry
According to statement of the Ministry of Environment and Forestry of Turkish Republic in 01.24.2011; “...considering the balance of use and protection, the General Directorate formes opinions about the process during the Environmental Impact Assessment pertinent to necessary measures for biodiversity, ensure continuity of the natural life and the amount of water needed in order to ensure continuity of the natural life”
Environmental Management Plans
Throughout EIA process, preparation of the operational activities relatedtothe Environmental Management Plan within the scope of Environmental Regulation, in order to preventpossibledamageto the environmentand disposal ofwastesthat may ariseis taken care and preparedby our experienced staffthat specialized inthe management planthat specifieshow to doprojects andactivities.
Reclamation Plans
All the rehabilitation work as complied on law regarding the forests, areas of agriculturalor pastureareas protection ofwater resourcesand mining operations that remains out of the reservoir are of dam, pond projects, excavations carried on in site for construction material, piling and waste sreleased to the environment by ensuring the safety of the environmentinal order toregainthe perishable structure of the nature andproper reclamation according to the project and synchronizing the project within relevant environment setting.
Hydrogeological and Power Plant Projects Reports
According to statement of the Ministry of Environment and Forestry of Turkish Republic in 01.24.2011; “...considering the balance of use and protection, the General Directorate formes opinions about the process during the Environmental Impact Assessment pertinent to necessary measures for biodiversity, ensure continuity of the natural life and the amount of water needed in order to ensure continuity of the natural life”
For these reasons, it became necessary to for all the projects regardless the status of the protect area, including hydroelectric power plant projects and applications for project promotion to be subjected to scientific evaluation.
Landscape Restoration Plans
During EIA process, Forestry,Department of Forestry and Water Affairs, General Directorate ofNature Conservationand National Parks requires that depending on the scope of project contents, if it is needed, experts from different disciplines to take part in the working group are required. Services for the Landscape Restoration Plan is also provided by Ekonorm.
You can contact us for detailed information.
Wetland Area Consent Forms
Wetland Operations Permit requested by the Department of Forestry and Water Affairs which is provided for you to ensure fast, economic andpractical through our expert team.
You can contact us for detailed information.
|