DOWNSTREAM (ANCIENT) REPORTS


Ancient (Downstream) reports for the Water Use Right to Water Rights;

  • Hydroelectric Power Plant Projects will be built right on the water at the basin level plant facilities or areas requiring downstream discharge determination of the amounts of water
  • Seek views on the relevant authorities (DSI, Provincial Directorate of Agriculture, Special Provincial Administration, Provincial Bank, etc.).
  • Regional Directorate of State Hydraulic Works approval of the report to be
Ekonorm Engineering       Ekonorm Engineering


Ekonorm Engineering
Top
 
© 2013 Ekonorm. Rights reserved.
Ekonorm Cevre IS Sagligi ve Guvenligi Olcumm Hiz. Muh. San. Tic. Ltd. Sti.